Skip to main content
Aerial view of an industrial gas storage and distribution platform

BUSINESS PILLAR

01 / 04

From idea to solution.

Our engineers and experts deliver reliable studies tailored to your industrial processes. Feasibility studies, sizing, risk analyses, regulatory compliance — we structure the intervention phases to secure your installations.

ENGINEERING DELIVERABLES

Five domains of technical study.

Full coverage of NG/LNG/LPG technical studies, from feasibility through regulatory documentation.

  • Vaporization studies

    Sizing and selection of vaporizers matched to your consumption profile and climate conditions.

  • NG / LNG / LPG conversion

    Comparative energy analysis, technical-economic feasibility, conversion dossiers for existing installations.

  • Butane / Propane mixes

    Proportion studies, behavior analysis, optimization for your seasonal constraints.

  • Electrical tracing

    Heat-tracing network studies to maintain fluidity in extreme conditions.

  • NG / LNG / LPG pipework networks

    Routing, sizing, pressure-loss calculations, compliance with ATG and DESP standards.

ON SITE

FPS Maroc technician inspecting a piping network on an industrial site

METHODOLOGY

Our intervention process.

A proven methodology, structured across 5 phases. The Studies & Expertise pillar concentrates its expertise on phases 1-3.

  1. 1

    Diagnosis

    Site audit, inventory of existing equipment, identification of regulatory constraints.

  2. 2

    Study

    Technical feasibility, sizing, risk analysis, regulatory documentation.

  3. 3

    Design

    Detailed plans, equipment selection, client validation, work scheduling.

  4. 4

    Implementation

    Civil works, assembly, commissioning, pressure and safety testing.

  5. 5

    Maintenance

    Preventive, curative, regulatory inspections, training of operations teams.

REFERENCES

Studies delivered for industrial leaders.

Three flagship references where the depth of study made the difference.

  • TOTAL

    Energy & Petroleum

    NG/LPG conversion study on storage sites

  • OCP

    Heavy industry

    process gas network study for production line

  • LAFARGE

    Heavy industry

    ATEX risk analysis and DESP dossier

READY TO START YOUR PROJECT?

Let's talk about your industrial gas needs.

Custom study, quote within 48h, end-to-end support. Our technical team responds with a concrete proposal.

Response guaranteed within 48 working hours