Skip to main content

SPECIALIZED EXPERTISE

Natural Gas & Liquefied Natural Gas

Studies, expertise and cutting-edge installation. Full mastery of the NG/LNG cycle: feasibility, design, installation to the strictest standards, maintenance of cutting-edge equipment. A team of specialized engineers serving your industrial projects — from the well head to the flare, through separation, storage and regulation.

Industrial NG/LNG storage facility — overview
NG/LNG industrial installation — Storage tanks and surface infrastructure

WHAT WE DELIVER

Four NG/LNG fundamentals.

Expertise structured around four pillars — each grounded in 20+ years of field experience.

In-depth studies

Complete feasibility studies, ATEX risk analyses, technical-economic evaluations. We confirm project viability before the first shovel of dirt.

Technical expertise

Guidance on design, maintenance and safety of your NG/LNG installations. Full regulatory documentation: DESP, ATG, ATEX, MASE.

Cutting-edge installation

Commissioning of NG/LNG systems to international standards. High and low pressure networks, detection systems, integrated automation.

Sustainability commitment

Eco-responsible solutions for a more sustainable future. Energy optimization, loss reduction, transition to lower-carbon-footprint fluids.

PRODUCTION PLATFORM

Anatomy of an NG/LNG installation.

Click the numbered points to discover each component's role and the FPS expertise that goes with it.

Tip: keyboard-navigable (Tab + Enter).

Natural gas storage tanks at a port site in Tangier

FIELD WORK

NG storage — execution on a port site.

Natural gas storage tanks installed in a port environment (Tangier). Civil works, supports, process connections, DESP regulatory compliance: from regulatory dossier to gas commissioning, FPS Maroc delivers storage capacity adapted to port-environment and industrial constraints.

EXCEPTIONAL CLIENT SERVICE

Our commitment, your peace of mind.

“Our commitment to clients is at the heart of our company. We work closely with you to understand your specific needs — and respond with the precision the NG/LNG sector demands.”
  • Response within 24h

    Quote requests handled within the working day.

  • Full compliance

    DESP, ATG, ATEX, MASE — complete regulatory dossier.

  • 7-day maintenance

    Local Mohammedia parts stock + mobile teams.

NG/LNG PROJECT?

Request your technical dossier.

Got an NG/LNG project? Our team of specialized engineers responds with a complete technical dossier within 48 working hours — constraint analysis, preliminary sizing, initial budget estimate.

Technical dossier within 48 working hours