Skip to main content
Aerial view of an industrial gas installation construction site by FPS Maroc

BUSINESS PILLAR

02 / 04

From civil works to commissioning.

Industrial installations of every capacity, for every fluid. Butane, Propane, Hydrogen, steam — from regulatory dossier to pressurization, FPS Maroc delivers ready-to-operate sites, DESP-compliant, equipped with fire management and gas detection.

INSTALLATION DOMAINS

Six technical domains covered.

“From idea to solution” — every capacity, every fluid, every pressure.

  • Industrial installations, every fluid

    Butane, Propane, Hydrogen, steam — process and distribution networks across every site type.

  • Storage and gas networks

    Above-ground / buried tanks, manifolds, ramps, pressure-reduction stations, multi-point distribution.

  • DESP compliance with full dossier

    Building the regulatory dossier, tracking notified-body inspections, commissioning.

  • Low and high pressure networks

    From domestic LP gas to process HP gas — calculations, routing, fit-for-purpose equipment.

  • Compliance upgrades for existing sites

    Audit, remediation plan, adaptation works, post-compliance documentation.

  • Fire management and gas detection

    Detection panels, shutoff solenoids, extinction systems integrated with the gas site.

OPERATIONS TEAM

FPS Maroc team in action during an industrial installation

METHODOLOGY

Our intervention process.

Proven methodology — the Installations pillar concentrates on phases 3-4.

  1. 1

    Diagnosis

    Site audit, inventory of existing equipment, identification of regulatory constraints.

  2. 2

    Study

    Technical feasibility, sizing, risk analysis, regulatory documentation.

  3. 3

    Design

    Detailed plans, equipment selection, client validation, work scheduling.

  4. 4

    Implementation

    Civil works, assembly, commissioning, pressure and safety testing.

  5. 5

    Maintenance

    Preventive, curative, regulatory inspections, training of operations teams.

REFERENCES

Turnkey installations delivered.

Three major sites where FPS Maroc delivered the full installation.

  • AFRIQUIA

    Energy & Petroleum

    LPG bottling center installation

  • VIVO ENERGY

    Energy & Petroleum

    distribution network on petroleum depot

  • SALAM GAZ

    Energy & Petroleum

    Butane distribution ramp installation

READY TO START YOUR PROJECT?

Let's talk about your industrial gas needs.

Custom study, quote within 48h, end-to-end support. Our technical team responds with a concrete proposal.

Response guaranteed within 48 working hours